Apr. 11, 2022
Subfloor:
A. The ground must be do waterproof. If it is a new built venue, or new doing self leveling treatment, then the installation only be done after the ground dry. For new built venue, the ground should wait at least 3-6 months before doing the installation of flooring.
B. All ground should be level, dry, no cracks, no sands and dust. Including concrete,ceramic tiles, wood floor... if there is cracks or not level, then you must fill and level up by gypsum powder or putty powder.
Steps:
A. Lay out and put all flooring together to the suitable position.
B. Unroll a half of one roll, and scraping a certain glue on the ground
C. When the glue are almost near to dry when we touch it by hand (about 10-20 minutes),then glue the flooring on the ground.
D. Using a wood board to press and pushing the flooring surface to make sure there is no bubble or air between the ground and floor.
E. Press and roll the flooring surface by professional metal roller.
F. Grooving: Should be test grooving and welding on one small pc of flooring firstly. Make sure the groove depth is about 1/2 thickness of flooring, grooving the same width on both edges of two rolls.
G. Welding: Make sure the temperature is set to 8.5-9.5 marking, almost reach 850- 900 degree centigrade. Then pull the welding gun to welding the rod with flooring together. Using the moon blade knife cut the ledge of welding rod to make sure the flooring surface smooth.